The best of EMC certification E20-017 exam training methods

IT-Tests.com provide training tools included EMC certification E20-017 exam study materials and simulation training questions and more importantly, we will provide you practice questions and answers which are very close with real certification exam. Selecting IT-Tests.com can guarantee that you can in a short period of time to learn and to strengthen the professional knowledge of IT and pass EMC certification E20-017 exam with high score.


If you buy IT-Tests.com EMC E20-017 exam training materials, you will solve the problem of your test preparation. You will get the training materials which have the highest quality. Buy our products today, and you will open a new door, and you will get a better future. We can make you pay a minimum of effort to get the greatest success.


Exam Code: E20-017

Exam Name: EMC (Information Availability Design Specialist Exam for Data Center Architects)

IT-Tests.com EMC E20-017 Training Kit is designed and ready by IT-Tests.com IT experts. Its design is closely linked to today's rapidly changing IT market. . IT-Tests.com training to help you take advantage of the continuous development of technology to improve the ability to solve problems, and improve your job satisfaction. The coverage IT-Tests.com EMC E20-017 questions can reach 100% , as long as you use our questions and answers, we guarantee you pass the exam the first time!


The exam materiala of the IT-Tests.com EMC E20-017 is specifically designed for candicates. It is a professional exam materials that the IT elite team specially tailored for you. Passed the exam certification in the IT industry will be reflected in international value. There are many dumps and training materials providers that would guarantee you pass the EMC E20-017 exam. IT-Tests.com speak with the facts, the moment when the miracle occurs can prove every word we said.


E20-017 (Information Availability Design Specialist Exam for Data Center Architects) Free Demo Download: http://www.it-tests.com/E20-017.html


NO.1 In the context of "establishing information availability," what is an operation management activity?
A. Capacity planning
B. Data classification
C. Testing
D. Implementation planning
Answer: A

EMC exam   E20-017   E20-017   E20-017

NO.2 A company's IT department is comparing two technology proposals. Option 1 would retain legacy
equipment while Option 2 would replace the existing equipment with a new one.
Option 1:
-Total operation costs = $400,000 per year -Annual storage requirements = $100,000 per year
Option 2:
-Initial investment = $1,250,000 -Recurring annual operation costs = $150,000 per year -Annual storage
requirements = $100,000 per year
The company's write-off costs for the legacy equipment is $50,000. As a business analyst using a TCO
analysis, which option would you recommend?
A. Option 1 is feasible if the project lifespan is less than 5 years
B. Option 1 is feasible if the project lifespan is more than 6 years
C. Options 1 and 2 are feasible if the project lifespan is 5 years
D. Option 2 is feasible if the project lifespan is less than 5 years
Answer: A

EMC   E20-017   E20-017 original questions   E20-017 practice test   E20-017

NO.3 A company wants to replace its physical tape library with a virtual tape library (VTL). To deploy the VTL,
the company spends $300,000 for the hardware costs and $50,000 for the implementation charges.
Once the data is migrated from the physical tape library to the VTL, the physical tape library will be
decommissioned for a cost of $50,000. The company will gain $70,000 per month due to this VTL
implementation.
What is the return on investment (ROI) in one year and the break-even point for the company ¯:s initial
investment?
A. 85%; Month 8
B. 85%; Month 9
C. 110%; Month 6
D. 110%; Month 8
Answer: C

EMC   E20-017 exam simulations   E20-017   E20-017

NO.4 In which focus area of the Information Availability Design Framework can seamless movement of data
between tiers of storage be found?
A. Automate
B. Create Copies
C. Distribute
D. Store
Answer: A

EMC test   E20-017 demo   E20-017 dumps   E20-017 braindump   E20-017   E20-017 original questions

NO.5 The exhibit represents a Component Failure Impact Analysis (CFIA) for a company's IT infrastructure.
Several Requests for Change (RFC) were raised.
Which RFC should be considered a priority for implementation?
A. Deploying a switch architecture with no single point of failure
B. Clustering the backup server with multiple storage devices
C. Configuring the NAS device in an active-active mode
D. Adding more disk drives to the storage array
Answer: A

EMC original questions   E20-017   E20-017 exam simulations   E20-017

NO.6 A company has a shared pre-staged infrastructure at an alternate site. This approach enables the
company to rebuild systems and applications in the event of a disaster.
What is the term for this strategy?
A. Hot site
B. Manual failover site
C. Cold site
D. Warm site
Answer: A

EMC pdf   E20-017   E20-017

NO.7 The exhibit represents the expected financial results of a storage technology investment.
What does the ® ¯: represent?
A. Cost of investment equals the gain from the investment
B. Asset exceeds liability
C. Deployment cost crosses the planned deployment time
D. Return on investment
Answer: A

EMC answers real questions   E20-017   E20-017 demo   E20-017 exam prep

NO.8 As represented in the exhibit, a company has a system with three critical components.
Each component must be functioning for the system to be operational. SLAs have been established
between the business and IT that define normal hours of operations for service as 8 A.M. - 8 P.M.,
Monday through Friday.
What is the availability (percentage) of Component 1?
A. 78
B. 81.7
C. 89
D. 91.7
Answer: B

EMC   E20-017 exam simulations   E20-017 study guide   E20-017

NO.9 A company has a system with three critical components as represented in the exhibit.
Each component must be functioning for the system to be operational. Following an outage, certain
components seem to take longer to restore back to service than others.
What is the mean time to repair (MTTR) for Component 3?
A. 2 hours
B. 3 hours
C. 5 hours
D. 10 hours
Answer: C

EMC braindump   E20-017 test questions   E20-017   E20-017   E20-017   E20-017 exam

NO.10 A company has estimated a cost of $240,000 to build its new data center. The new data center will
serve an additional 20,000 clients for which the company will gain $35,000 per month. In addition, the
company has agreed to spend $2,000 every month in support costs.
In order to achieve a break-even point, what is the minimum time period the data center must be
operational?
A. 8 months
B. 9 months
C. 10 months
D. 11 months
Answer: A

EMC certification training   E20-017 pdf   E20-017   E20-017

NO.11 As represented in the exhibit, a company has a system with three critical components. Each component
must be functioning for the system to be operational.
What is the scheduled availability (percentage) for the system?
A. 84
B. 86
C. 88
D. 90
Answer: C

EMC exam simulations   E20-017   E20-017 test answers   E20-017 test   E20-017 test answers

NO.12 Based on strategic plans regarding green initiatives, an IT department is considering server
consolidation in its data centers.
Which set of elements should be included in the business value analysis to maximize the ROI for such an
initiative?
A. Asset utilization, recovery of stranded assets, and cost of floor space and power
B. Productivity of staff, response to business conditions, and utilization of storage
C. Asset utilization, backup costs, and need for availability
D. Cost of floor space and power, FTE-managed TB of storage, and reduction in SLA penalties
Answer: A

EMC   E20-017 braindump   E20-017   E20-017

NO.13 A company has estimated a cost of $220,000 to build its new data center. The new data center will
serve an additional 20,000 clients for which the company will gain $30,000 per month. In addition, the
company has agreed to spend $1,000 every month in support costs.
In order to achieve a break-even point, what is the minimum time period the data center must be
operational?
A. 8 months
B. 9 months
C. 10 months
D. 11 months
Answer: A

EMC   E20-017 test questions   E20-017 questions

NO.14 A company wants to replace its physical tape library with a virtual tape library (VTL). To deploy the VTL,
the company spends $300,000 for the hardware costs and $60,000 for the implementation charges. Once
the data is migrated from the physical tape library to the VTL, the physical tape library will be
decommissioned for a cost of $50,000. The company will gain $60,000 per month due to this VTL
implementation.
What is the return on investment (ROI) in one year and the break-even point for the company ¯:s initial
investment?
A. 35%; Month 6
B. 35%; Month 7
C. 76%; Month 6
D. 76%; Month 7
Answer: D

EMC certification training   E20-017 exam prep   E20-017 dumps   E20-017   E20-017 practice test   E20-017

NO.15 In which focus area of the Information Availability Design Framework can platform integrity be found?
A. Store
B. Automate
C. Create copies
D. Distribute
Answer: A

EMC demo   E20-017 pdf   E20-017 test answers   E20-017   E20-017 demo   E20-017 demo

Through IT-Tests.com you can get the latest EMC certification E20-017 exam practice questions and answers. Please purchase it earlier, it can help you pass your first time to participate in the EMC certification E20-017 exam. Currently, IT-Tests.com uniquely has the latest EMC certification E20-017 exam exam practice questions and answers.